Hazell Bros Group :: Business in Motion
Projects

Launceston Aquatic Centre

Related Services Utilised

The redevelopment of the Launceston Aquatic Centre includes a new double storey swimming pool complex with infrastructure and buildings.

The existing pools and structures will be partially demolished to enable the redevelopment of the Aquatic Centre.  The new building area spans approximately 6000m² and approximately 450m² of the existing building will be renovated.

External works include landscaping, footpaths, fences, steps, walls, new car park area and roads.

Scope of Works

  •  Reinforced concrete floor slabs
  • Structural steel portal frames
  • Low pitched metal deck roofs
  • Combination of precast concrete panelling
  • Lightweight cladding
  • Glazing to steel framed external walls
  • Aluminium framed window
  • Aluminium framed feature glazed walls and timber sun louvers
  • All associated civil works including:
  • Stormwater
  • Car park drainage
  • Line marking